Could I help you?

PIP STF05121

PIP STF05121 Anchor Fabrication and Installation Into Concrete [Complete Revision]

standard by Process Industry Practices, 06/01/2017

More details

Reduced price!
M00000864
New product
Limited time offer:

$89.55

$199.00

-55%

In stock

- +

Add to compare

 
More info

Full Description

This Practice provides details and requirements for anchor fabrication and installationinto concrete. Anchors are anchor rod assemblies that include a rod threaded at the twoends, nuts, washers, and anchor plates and/or sleeves if required. J-bolts and L-bolts arenot included. Three standard lengths are shown for each diameter anchor rod in both U.S.Customary units and Metric (SI) units.

This Practice also provides requirements for non-standard anchor rod lengths.

 
Custom tab

This is a custom block edited from admin panel.You can insert any content here.

30 other products in the same category:

Compare 0

No products

To be determined Shipping
$0.00 Total

Check out