Could I help you?

IEEE C37.122.3-2011

IEEE C37.122.3-2011 IEEE Guide for Sulphur Hexafluoride (SF6) Gas Handling for High-Voltage (over 1000 Vac) Equipment

standard by IEEE, 01/09/2012

More details

Reduced price!
M00093150
New product
Limited time offer:

$45.00

$100.00

-55%

In stock

- +

Add to compare

 
More info

Full Description

Scope

This guide describes significant aspects of handling SF6 gas used in electric power equipment, such as gas recovery, reclamation, and recycling, in order to keep the gas permanently in a closed cycle and to avoid any deliberate release into the environment.

Purpose

To provide state-of-the-art technologies and procedures to minimize SF6 gas emission to a minimum functional level for the electric power equipment to preserve the environment. This guide will include allthe aspects for consideration during commissioning and recommissioning, topping up, refilling, checking the gas quality at site, sampling and shipment for off-site gas analysis, and recovering and reclaiming during normal operation and at the end of the life of power equipment while dismantling. This guide also presents the state-of-the art tools and measuring devices including the necessary personnel protective equipment. The basis for the preparation of this guide is CIGRE Brochure No. 276, Guide for preparation of customized "Practical SF6 handling instructions," August 2005 edition, developed by the Study Committee B3, Task Force B3.02.01.

Abstract

New IEEE Standard - Active.Significant aspects of handling SF6 gas used in electric power equipment such as gas recovery, reclamation, recycling in order to keep the gas permanently in a closed cycle and avoiding any deliberate release in environment are described. The purpose of this guide is to provide state-of-the-art technologies and procedures to minimize SF6 gas emission to a minimum functional level for the electric power equipment to preserve the environment. This guide will include all the aspects for consideration during commissioning and recommissioning, topping up, refilling, checking the gas quality at site, sampling and shipment for off-site gas analysis, and recovering and reclaiming during normal operation and at the end of the life of power equipment while dismantling. This guide also presents the state-of-the art tools and measuring devices including the necessary personnel protective equipment. The basis for the preparation of this guide is CIGRE Brochure No. 276, Guide for preparation of customized "Practical SF6 handling instructions," August 2005 edition, developed by the Study Committee B3, Task Force B3.02.01.

 
Custom tab

This is a custom block edited from admin panel.You can insert any content here.

30 other products in the same category:

Compare 0

No products

To be determined Shipping
$0.00 Total

Check out