This document assists gas-lift system operators, analysts, technicians, engineers, and others in understanding how to effectively plan, operate, maintain, troubleshoot and provide surveillance for gas-lift systems and gas-lift wells. These recommended practices discuss continuous gas-lift with injection in the casing/tubing annulus and production up the tubing. Annular flow gas-lift (injection down the tubing and production up the annulus), dual gas-lift (two tubing strings in the same casing), and intermittent gas-lift are mentioned; however, most of the discussion focuses on conventional continuous gas-lift.
Product Details
Edition: 3rd Published: 06/01/2008 Number of Pages: 123 File Size: 1 file , 5.1 MB Redline File Size: 2 files , 19 MB Product Code(s): G11V53, G11V53, G11V53 Note: This product is unavailable in Cuba, Iran, North Korea, Syria
Custom tab
This is a custom block edited from admin panel.You can insert any content here.