Could I help you?

AASHTO R 42-06 (2020)

AASHTO R 42-06 (2020) Standard Practice for Developing a Quality Assurance Plan for Hot-Mix Asphalt (HMA)

standard by American Association of State and Highway Transportation Officials, 2006

More details

Reduced price!
M00002366
New product
Limited time offer:

$54.90

$122.00

-55%

In stock

- +

Add to compare

 
More info

Full Description

AASHTO R 42-06 (2020) provides the necessary quality assurance plan for control, verification, and acceptance of HMA pavement. It contains requirements for both quality control and acceptance.

This standard practice provides framework for a quality control plan that establishes minimum requirements and activities for a contractor's quality control (QC) system related to HMA production and placement. These requirements include a listing of the inspections and tests necessary to substantiate material and product conformance to the specifications. The primary method of field quality control employs the use of the Superpave gyratory compactor and evaluation of the volumetric properties of the mix.

This standard practice also provides framework for a plan that establishes acceptance requirements for an agency's assessment and acceptance of an HMA project.

 
Custom tab

This is a custom block edited from admin panel.You can insert any content here.

30 other products in the same category:

Compare 0

No products

To be determined Shipping
$0.00 Total

Check out