Could I help you?

AASHTO ABC-1

AASHTO ABC-1 LRFD Guide Specifications for Accelerated Bridge Construction, 1st Edition

standard by American Association of State and Highway Transportation Officials, 2018

More details

Reduced price!
M00001253
New product
Limited time offer:

$121.50

$270.00

-55%

In stock

- +

Add to compare

 
More info

Full Description

AASHTO ABC-1: Many state DOTs and the Federal Highway Administration are actively promoting accelerated bridge construction (ABC) to reduce traffic impacts, onsite construction time, environmental impacts, and life cycle costs; and to improve work zone safety, site constructability, material quality, and product durability, while replacing the nation's transportation infrastructure. With ABC, prefabricated elements reduce or eliminate the onsite construction time that is needed to build a similar structural component using conventional construction methods. These guide specifications compile the growing body of recommended design and construction specifications for prefabricated bridge elements and systems for ABC with a focus on constructability and durability.

 
Custom tab

This is a custom block edited from admin panel.You can insert any content here.

30 other products in the same category:

Compare 0

No products

To be determined Shipping
$0.00 Total

Check out